Menu

Home About Contact

Services

Turnkey Project Contracting Project Management Maintenance & Facility Management Cinema & Home Theatre Snagging Marketing, PR & Communication Management Consultancies AI Research & Consultancy Info@innovagroup.co.ae

Home/Services/Snagging

Service 05

Find it before you sign for it.

An independent inspection of your property before handover. Every defect photographed, located and described in a report the developer can act on — and we come back to check they did.

The offer

The last moment your leverage is free

Once you accept handover, defects become a warranty claim: slower, more contested and sometimes at your cost. Before you accept, they are simply the developer's outstanding work.

A snagging inspection uses that window properly. We go through the property room by room against finishing standards, record every defect with a photograph and a location, grade it by severity, and issue a register formatted for the developer's own rectification process.

We are independent of the developer and the contractor. We are paid to find things.

What we inspect

Room by room, system by system

The inspection depth depends on the package; the reporting standard does not change.

  • Doors, windows, ironmongery, alignment and seals
  • Joinery, wardrobes, kitchen units and worktops
  • Tiling, grouting, flooring, skirting and transitions
  • Paint, plaster, ceilings and decorative finishes
  • Electrical points, switches, lighting and distribution boards
  • Plumbing fixtures, water pressure, drainage and leaks
  • Air conditioning performance, airflow and condensate
  • Thermal imaging of AC, wet areas and insulation gaps
  • Moisture readings on walls, floors and wet areas
  • Balconies, external finishes, roofs and drainage falls
  • Pool plant, landscape and external services where present
  • Severity-graded register with photographs and locations

Packages

Three depths of inspection

Priced by property type and size. Reports are issued in a developer-ready format.

Standard Snag

Apartments and townhouses at first handover.

  • Full room-by-room visual inspection
  • Photographic defect register with locations
  • Severity grading — critical, major, minor
  • Developer-ready report format
  • Report issued within 48 hours
  • Telephone debrief on the findings
Request a quote

Villa & Portfolio

Large villas, multiple units or investor portfolios.

  • Everything in Snag & Re-Inspect
  • Two re-inspections included
  • External areas, roof, balconies and drainage falls
  • Pool plant, landscape and external services
  • MEP performance testing across all systems
  • Consolidated register across multiple units
  • Attendance at the developer handover walkthrough
Request a quote

Packages are a starting point, not a limit. If none of them matches what you need, tell us what does and we will scope it.

How it works

From first call to close-out

Book

Ideally before you sign the handover acceptance. We can usually attend within a few days.

Inspect

A methodical pass through every room and system, photographing and locating each defect.

Report

A severity-graded register issued within 48 hours, formatted so the developer can work from it directly.

Re-inspect

After rectification we return, verify each item and issue a close-out report confirming what was actually fixed.

Questions

Before you ask

When should the inspection happen?

Between the developer notifying you that the unit is ready and you signing the handover acceptance. That is the point at which outstanding work is still clearly the developer's obligation.

What if the developer disputes the report?

Every item is photographed, located and graded, which makes most items difficult to dispute. Where a disagreement remains, we can attend the walkthrough and present the finding directly.

Can you snag a property that's already handed over?

Yes. It is still useful within the defects liability period, and essential before a fit-out so that pre-existing defects are recorded before your own contractor starts.

Do you carry out the repairs?

Not on a property we have snagged for you — the inspection stays independent. If you want the work done, our contracting and maintenance teams can quote separately once the register is closed.

Also from the group

Often engaged alongside this

Turnkey Project Contracting

Design, build and hand over under one contract — from empty shell to a completed, tested, ready-to-occupy space.

Explore

Project Management

Independent control of programme, cost, quality and risk on your behalf — from brief and tender through to handover.

Explore

Maintenance & Facility Management

Planned and reactive maintenance that keeps buildings, systems and occupants running without interruption.

Explore

Talk to us about snagging

Tell us the scope, the site and the date it has to happen by. We will come back with questions and a written proposal.

Make an enquiry